Articles Menu
VANCOUVER — Two potential geothermal energy projects near Pemberton could generate electricity for about seven cents a kilowatt hour — only slightly higher than the 5.8 cents to 6.1 cents a kilowatt hour cost estimate of the Site C dam project.
That's the conclusion of a recent Kerr Wood Leidal Associates study on the economic viability of geothermal resources in B.C., which considered nine of the most favourable geothermal sites in the province.