TC Energy, in the construction of the Coastal Gaslink Pipeline (CGL) has been reported by the Narwhal and a Citizen Monitoring Group as “having committed numerous environmental infractions, including slope failures, flooded worksites, and sediment entering wetlands and waterways.”
This post originally appeared on Rolling Stone and was published January 21, 2020.
In 2014, a muscular, middle-aged Ohio man named Peter took a job trucking waste for the oil-and-gas industry. The hours were long — he was out the door by 3 a.m. every morning and not home until well after dark — but the steady $16-an-hour pay was appealing, says Peter, who asked to use a pseudonym. “This is a poverty area,” he says of his home in the state’s rural southeast corner. “Throw a little money at us and by God we’ll jump and take it.”
In 2018, Husky Energy asked Stephen Mason, who has years of experience developing oil and gas projects on the African continent, to get First Nations together to put in a bid to buy the Trans Mountain Expansion (TMX) Pipeline. Husky, which has since been bought by Cenovus, had already booked space on the yet-to-be-built pipeline to get its oil from Alberta to the Pacific coast, where it could sell at higher prices.
‘No other way to do it’: Biden about to go big on power plants
Historically strict EPA regulations on coal- and gas-fired power plants are due out. They face legal and political peril.
The Biden administration is poised to unveil its most ambitious effort yet to roll back planet-warming pollution from the nation’s thousands of power plants — an effort that’s certain to bring a legal and political attack from conservatives but may disappoint some supporters of the president’s climate agenda.
Beleaguered engineering firm SNC-Lavalin was among the big winners of no-bid contracts for the over-budget hydro project on B.C.’s Peace River, according to documents obtained by The Narwhal
Over the past three years, undisclosed BC Hydro employees quietly awarded more than $430 million in contracts — without any competition — to three dozen companies and consultants for work on the troubled Site C hydro dam, according to a list obtained by The Narwhal.